I have a column 100x100cm that was designed as a composite section with 44 nos dia 32 bars and H beam H400 in the middle.
Due to the difficulties in construction it was proposed that the H beam is replaced with 24 nos dia 40 rebars
The total reinforcement of the column is 6.5% what is less then max allowed 8%. Its calculated Axial capacity based on the proposal is Ok
Is there any restriction in the code not to place longitudinal rebars in the middle part of the column if the column is loaded only centricaly with very minor moment
If somebody has done a similar column with reinforcement in the central part I will be grateful to receive that what I intend to do is correct
Due to the difficulties in construction it was proposed that the H beam is replaced with 24 nos dia 40 rebars
The total reinforcement of the column is 6.5% what is less then max allowed 8%. Its calculated Axial capacity based on the proposal is Ok
Is there any restriction in the code not to place longitudinal rebars in the middle part of the column if the column is loaded only centricaly with very minor moment
If somebody has done a similar column with reinforcement in the central part I will be grateful to receive that what I intend to do is correct