Hello all,
you guys do great work!
Contractor has lift station to place with in 60' of river. Water table at 4.9'. Very dense sand and gravel 50/4" at 5'and 15' remainder is 25-35 blow count sand/gravel with one clay layer at 20-23'.
Lift station 96" to be placed 19' deep.
any thoughts on alternative to sheetpile as not driveable through the hard layers.
Thank you.
Ted