meister
Chemical
- Nov 20, 2001
- 19
I have several new coded vessels. The outlet nozzle is actually quite long (6 feet) due to fit up requirements. I need to weld on this "pipe" prior to the first flange/nozzle. Is this pipe considered to be part of the vessel falling under code repair requirements, or can it be treated as pipe B31? There are several existing circumferential welds closer to the actual vessel where my weld will be. I need this weld to correct fit up problems. Please reference code paragraphs when responding. THANKS