Mudcake
Geotechnical
- Jul 11, 2003
- 6
Renovations of a c. 1926 Fire Station are planned. The building has a basement and is supported on timber piles with concrete pile caps. Groundwater is near the top of pile caps. The planned renovation will increase loads on the existing piles. Any non-destructive testing that can be used to estimate the capacity of the existing piles?