CMMehanicalWorks
Mechanical
- Oct 11, 2013
- 4
This may be in the wrong section but let me know if it is, I work in the Mechanical construction industry (Oil and Gas) and I have come across times where it would be beneficial to know how much of a weld is required in order to ensure the weld is sufficient to hold a lifting EYE/LUG to an embedded plate in the ceiling while a load is suspended from it. I have been in contact with welding engineers who are unable to tell me, and in the past we have had to use alternative methods to lift Pumps, Skids pipelines valves and headers as nobody is able to submit calculations to determine the load capacity. Any help of links to websites or books would be a help. Thanks