STONE85
Industrial
- Jul 16, 2021
- 33
Hello,
In regards to cable calculations to bs7671. If we have a cable that needs to run through a duct bank for a small section of its run say 5m and the remainder >80m is in a subway. When we derate can we ignore the duct bank portion?
Thank you
In regards to cable calculations to bs7671. If we have a cable that needs to run through a duct bank for a small section of its run say 5m and the remainder >80m is in a subway. When we derate can we ignore the duct bank portion?
Thank you