Daamz
Civil/Environmental
- Jan 6, 2006
- 6
For a 48" C303 pipe (bar-wrapped concrete pipe) rated for 10' of cover, is it usually acceptable to use CLSM (up to 1' above the pipe) if the depth of cover is around 15'-20'?
Thank you,
Thank you,