jakin
Geotechnical
- Oct 19, 2004
- 32
At a wastewater treatment plant, a 70-year old 180ft long 12in dia. crock pipe, located nearly 40ft below ground and conveying wastewater from an underground tank (via a manhole) to a tunnel, was recently found to leak and need replacement. There are several utility lines in the top 10ft of soil at this facility. Any idea about the best way to design for this replacement would be appreciated.