bilal2008
Civil/Environmental
- Jun 24, 2011
- 1
Dear all, I'm a subcontractor and I have recently signed a contract to back fill soft sand in desert land.Natural ground level have taken prior to back filling. This type of sand moves by the wind and creates hills of about 1-3 meters high. We have levelled the sand then back filled with rocky sand or A1A. On completion of the job, level have been taken again but 50% of the expected thickness is missing. This has caused conflict between us and main contractor as there are some loses involve.
Would someone help us and suggest possibilities please?
Thanks