Your advanced analysis shows that all points of the soil under your foundation will settle and non uniform settlement curve is observed ; say look like a half or quarter circular shape (depending on the load of the foundation).
How the total settlement usually assessed:
Do you take an average value or you take settlement of the point having maximum settlement along this curve and consider it as the total settlement.
Please advise
P.S I did not expect to get stuck at a simple matter like this, this is probably due to lack of practical experience