Rabbit12
Structural
- Jul 23, 2014
- 495
I have a situation where I need to pull test some adhesive anchors. Is there any other guidelines to testing other than IBC Chapter 17? I'm specifically looking for guidance on appropriate factors of safety, load test requirements, and load duration.
In the IBC they reference keeping the load applied for 24 hours for static loads but for dynamic loads it's rather ambiguous. For a cantilever wind screen column what would an appropriate duration be?
In the IBC they reference keeping the load applied for 24 hours for static loads but for dynamic loads it's rather ambiguous. For a cantilever wind screen column what would an appropriate duration be?