Part of a project to expand a gas processing facility (H2S, CO2, and dehy) and there was a bit of a mix up where some small bore A105 fittings were installed where A105N fittings were specified. All of the fittings installed are compliant to NACE MR0175. It seems redundant to require A105N fittings being that NACE MR0175 requires some type of hot forming or heat treatment. With the fittings already being NACE MR0175 compliant, is there any benefit to them being normalized as well, or any risk if we don't cut them out and replace them with normalized fittings?
The fluid service is process drains and flare header connections at a TEG dehy, so the chances of coming in contact with sour services is very small, but can't say it's impossible.
Thanks!
The fluid service is process drains and flare header connections at a TEG dehy, so the chances of coming in contact with sour services is very small, but can't say it's impossible.