gao7857
Mechanical
- Aug 16, 2010
- 37
This coupling is connecting a 100mm pipe to a 150mm pipe. The contract molder was using a 280ton JSW (max rate 32oz/s) to mold the single cavity mold, with the circular gate (2mm at part) at the larger outlet surface. The thickness is about 5mm for both outlets except the joint a little thicker.
The molder uses room temperature mold, 185C barral temp for the mid-flow pvc.
At the beginning, the part looks good but dimension of smaller outlet is out of the tolerance. The molder thought it does not flow well at the joint thus not packed well thereafter. So they cut new insert so there are dents in the joint section, making the cross section smaller, though I later feels that cross section may become too small. The part still have the tolerance problem, and at the same time there are short shots at the dents area. The melt freezes before it start to pack. The part also become more brittle that it starts to fail the impact test.
So now we ask the molder to send the moulds to us to play in house. It has not arrived yet. But I am thinking of what should I do and what to get some inputs, as it is new to me in practical. Thanks in advance. Any input/comment is welcome.
What I think first is to go back to the part/insert without the dents, which creates more problm that it solves.
Second is to use our 450T machine to add more power. However I am not sure about what should I try first: I would like to enlarge the gate size to 2.5mm. Then I can shorten the fill time from 9s to maybe 7s with the hope the shear does not go up too much. One big issue is that the part is quite hot when ejected and will continue shrink, as we cannot increase the cycle time so that it cools down. How should I make sure it shrink correctly after ejection to within tolerance?
Any other places that I should pay attention to? Thanks!
The molder uses room temperature mold, 185C barral temp for the mid-flow pvc.
At the beginning, the part looks good but dimension of smaller outlet is out of the tolerance. The molder thought it does not flow well at the joint thus not packed well thereafter. So they cut new insert so there are dents in the joint section, making the cross section smaller, though I later feels that cross section may become too small. The part still have the tolerance problem, and at the same time there are short shots at the dents area. The melt freezes before it start to pack. The part also become more brittle that it starts to fail the impact test.
So now we ask the molder to send the moulds to us to play in house. It has not arrived yet. But I am thinking of what should I do and what to get some inputs, as it is new to me in practical. Thanks in advance. Any input/comment is welcome.
What I think first is to go back to the part/insert without the dents, which creates more problm that it solves.
Second is to use our 450T machine to add more power. However I am not sure about what should I try first: I would like to enlarge the gate size to 2.5mm. Then I can shorten the fill time from 9s to maybe 7s with the hope the shear does not go up too much. One big issue is that the part is quite hot when ejected and will continue shrink, as we cannot increase the cycle time so that it cools down. How should I make sure it shrink correctly after ejection to within tolerance?
Any other places that I should pay attention to? Thanks!