Is there any IGCC installed for the refinery use? Fyi,we are in the feasibility study phase to install IGCC to supply power, steam, and H2 for our new 200,000 BPSD refinery. Expected power production is 160 MW, excluding power for ASU
Hi,
I was requested to calculate the UCC for our newly installed Cogen Plant (4 GTGs + 1 STG) and to compare with the charges by the utility power company. Below is the sample of calculation.
Post Cogen : RM 68.2/MW-hr or USD 20.1/MW-hr
Utility Company : RM 220.5/MW-hr or USD 64.9/MW-hr...
gr2vessels,
Actually I need both i.e. list of contractors (EPCM or EPCC) who got experinece in designing & constructing IGCC and also IGCC operators.
Thanks
ppm
Hi,
I was requested to calculate the UCC for our newly installed Cogen Plant (4 GTGs + 1 STG) and to compare with the charges by the utility power company. Below is the sample of calculation.
Post Cogen : RM 68.2/MW-hr or USD 20.1/MW-hr
Utility Company : RM 220.5/MW-hr or USD 64.9/MW-hr...
Hi,
We are planning to construct a 250,000 BPSD refinery. For power/steam supply we are also planning to install IGCC as an integrated facilities with the refinery.
Anyone got previous experiences on IGCC within a refinery. We anticipate a 200MW IGCC.
Thanks
ppm
Hi,
The GTG is designed based on certain composition of gas. Currently we don't have monitoring device to check the gas composition entering GTG. What is the impact to GTG if there is significant changes on the gas composition?
ppm
Hi,
Currently our fuel gas skid got heater to ensure/control fuel gas temp entering GTG combustor at 42 C. If the heater fail/trip & let say the FG temp reduces below 30 C, what is the impact to GTG? Was told the GTG will trip? What the normal criteria of FG temp?
Thanks
ppm
Yes Raghun, we can afford to shutdown the GTG whenever we have problem with HRSG/STG. We have so much spare on the power i.e. about 35% spinning reserve. For steam we have auxiliary boiler.
pressure drop, temperature & sealing another criteria.
In a big combined cycle power plant, it is quite...
It is an issue for us becoz our company standard requires RCU but the OEM for our gas turbine package states that it is not their standard practice to supply the RCU for their supplied motors (i can't remember the technical reasons but I'll come back later).
Yu are right abeltio, 300m cable lenth requirement doesn't mean the distance between the unit and the rack room. It is from the sensor at site to terminal point at the rack room.
As informed by the OEM, there's no "negotiation" for thermocouple. But for other application, they are willing to...
We are in the process of signing an agreement with the OEM. We call it a Long Term Service Agreement (LTSA). But this agreement is mainly to cover the schedule inspection of the gas turbine like boroscope inspection, combustion inspection,hot gas path inspection & major inspection.
I guess as a...
Thanks sms & byrdj
Yes I'm currently working on one train of cogen plant. It is an expansion of the current cogen plant which consists of 4 GTGs/HRSGs + 1 STG. The new train will have one unit of GTG and HRSG.
We split the contract into 2 main packages i.e. supply of GTG (ex-work) and EPCC...
Hi,
We are planning to engage OEM engr/specialist for the supervision for installation, commissioning and performance testing of our gas turbine package. The contract will be on reimbursable basis i.e. manhour rate.
Any advise on how to effectively manage this type of contract? Any lessons...
Hi,
Our company standard states the following requirements:
"Electric drives shall be provided with an RCU mounted local to the motor. By means of this RCU, motors can be started/stopped and, in the "O" (neutral) position, automatically control"
Is this common practice even for small LV motor...
Our GE MS5001 PA efficiency only 28% at temp = 26.8 C and RH = 84.2% and load = 100% (24.9MW with 8.4 t/ht of steam injection). Normal operation only 24% efficiency