Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: ppmsb
  • Order by date
  1. ppmsb

    IGCC Technology

    Is there any IGCC installed for the refinery use? Fyi,we are in the feasibility study phase to install IGCC to supply power, steam, and H2 for our new 200,000 BPSD refinery. Expected power production is 160 MW, excluding power for ASU
  2. ppmsb

    Unit Cash Cost for Cogeneration Plant

    Hi, I was requested to calculate the UCC for our newly installed Cogen Plant (4 GTGs + 1 STG) and to compare with the charges by the utility power company. Below is the sample of calculation. Post Cogen : RM 68.2/MW-hr or USD 20.1/MW-hr Utility Company : RM 220.5/MW-hr or USD 64.9/MW-hr...
  3. ppmsb

    IGCC for the Refinery

    gr2vessels, Actually I need both i.e. list of contractors (EPCM or EPCC) who got experinece in designing & constructing IGCC and also IGCC operators. Thanks ppm
  4. ppmsb

    Unit Cash Cost (UCC) for Cogeneration Plant

    Hi, I was requested to calculate the UCC for our newly installed Cogen Plant (4 GTGs + 1 STG) and to compare with the charges by the utility power company. Below is the sample of calculation. Post Cogen : RM 68.2/MW-hr or USD 20.1/MW-hr Utility Company : RM 220.5/MW-hr or USD 64.9/MW-hr...
  5. ppmsb

    IGCC for the Refinery

    Hi, We are planning to construct a 250,000 BPSD refinery. For power/steam supply we are also planning to install IGCC as an integrated facilities with the refinery. Anyone got previous experiences on IGCC within a refinery. We anticipate a 200MW IGCC. Thanks ppm
  6. ppmsb

    IGCC Technology

    Anyone to share knowledge & experience on Integrated Gasification Combined Cycle (IGCC) technology? ppm
  7. ppmsb

    Fuel Gas Temperature to GTG

    was informed by my colleague that fuel gas temp needs to be 15 C higher than the hydrocarbon acid dewpoint?
  8. ppmsb

    Fuel Gas Composition

    Hi, The GTG is designed based on certain composition of gas. Currently we don't have monitoring device to check the gas composition entering GTG. What is the impact to GTG if there is significant changes on the gas composition? ppm
  9. ppmsb

    Fuel Gas Temperature to GTG

    Hi, Currently our fuel gas skid got heater to ensure/control fuel gas temp entering GTG combustor at 42 C. If the heater fail/trip & let say the FG temp reduces below 30 C, what is the impact to GTG? Was told the GTG will trip? What the normal criteria of FG temp? Thanks ppm
  10. ppmsb

    Provision of Bypass Stack

    Yes Raghun, we can afford to shutdown the GTG whenever we have problem with HRSG/STG. We have so much spare on the power i.e. about 35% spinning reserve. For steam we have auxiliary boiler. pressure drop, temperature & sealing another criteria. In a big combined cycle power plant, it is quite...
  11. ppmsb

    Requirement for Remote Control Unit (RCU) for small motor

    It is an issue for us becoz our company standard requires RCU but the OEM for our gas turbine package states that it is not their standard practice to supply the RCU for their supplied motors (i can't remember the technical reasons but I'll come back later).
  12. ppmsb

    Control/Signal Cable Length Requirement for Gas Turbine

    Yu are right abeltio, 300m cable lenth requirement doesn't mean the distance between the unit and the rack room. It is from the sensor at site to terminal point at the rack room. As informed by the OEM, there's no "negotiation" for thermocouple. But for other application, they are willing to...
  13. ppmsb

    Gas Turbine Efficiency

    60% is high but that is for large machine & combined cycle. What about machine (20-30MW) & simple cycle?
  14. ppmsb

    Machine Monitoring System 1 (MMS) Rev 5 & Rev 6

    We are in the process of signing an agreement with the OEM. We call it a Long Term Service Agreement (LTSA). But this agreement is mainly to cover the schedule inspection of the gas turbine like boroscope inspection, combustion inspection,hot gas path inspection & major inspection. I guess as a...
  15. ppmsb

    Provision of OEM GTG Engrs/Specialist - Installation/Commissioning

    Thanks sms & byrdj Yes I'm currently working on one train of cogen plant. It is an expansion of the current cogen plant which consists of 4 GTGs/HRSGs + 1 STG. The new train will have one unit of GTG and HRSG. We split the contract into 2 main packages i.e. supply of GTG (ex-work) and EPCC...
  16. ppmsb

    Provision of Bypass Stack

    Hi, What are the criteria to install bypass stack between GT and HRSG? ppm
  17. ppmsb

    Provision of OEM GTG Engrs/Specialist - Installation/Commissioning

    Hi, We are planning to engage OEM engr/specialist for the supervision for installation, commissioning and performance testing of our gas turbine package. The contract will be on reimbursable basis i.e. manhour rate. Any advise on how to effectively manage this type of contract? Any lessons...
  18. ppmsb

    Requirement for Remote Control Unit (RCU) for small motor

    Hi, Our company standard states the following requirements: "Electric drives shall be provided with an RCU mounted local to the motor. By means of this RCU, motors can be started/stopped and, in the "O" (neutral) position, automatically control" Is this common practice even for small LV motor...
  19. ppmsb

    Gas Turbine Efficiency

    Our GE MS5001 PA efficiency only 28% at temp = 26.8 C and RH = 84.2% and load = 100% (24.9MW with 8.4 t/ht of steam injection). Normal operation only 24% efficiency
  20. ppmsb

    Instrument Protective Function (IPF) Review

    IPF : Instrumented Protective Function, more towards risk assessment for instrumentation control/safeguarding system.

Part and Inventory Search