  1. Sharik

    PSV Serial Number

    An example of someone else's PSV nameplate:
  2. Sharik

    PSV Serial Number

    Is a serial number required on a PSV ASME Code nameplate? If not, how are PSV Service Reports traceable to the particular PSV?
  3. Sharik

    Plate Heat Exchangers

    Would Partial Data Reports be required for the new plate exchanger plates?
  4. Sharik

    Plate Heat Exchangers

    The scope of repair/alterations would be the replacement of plates or the installation of additional plates.
  5. Sharik

    Plate Heat Exchangers

    For replacement plates for Plate Heat Exchangers, what are the required documentation? Is a Partial Data Report required or are just Mill Test Reports traceable to the plates sufficient?
  6. Sharik

    PSV Set Pressure vs Operating Pressure

    Is there a limit between the PSV set pressure and the operating pressure? For example, if a system was designed with a MAWP of 1000 psig and the safety relief valve has a set pressure of 1000 psig, would this be acceptable if the system operating pressure was reduced to 500 psig? The system is...
  7. Sharik

    Need help from experts to solve this problem

    I would recommend getting a 'boat' sample of the base metal and HAZ and sending to a qualified lab. If there is HIC or SOHIC present, then the welding required for the repair gets much more complicated, preheat temperatures, PWHT, etc.
  8. Sharik

    Vegetation Near API 650 Storage Tanks

    LittleInch: You would think common sense wouldn't you? RVAmeche: Thank you
  9. Sharik

    Vegetation Near API 650 Storage Tanks

    Where does it state there must not be vegetation growing close to API 650 Storage Tanks. I know there shouldn't be but I need to show someone it is an actual requirement.
  10. Sharik

    ASME Section I PSV Servicing/Testing

    Is it acceptable to use in-situ hydraulic testing methods in lieu of removing, dismantling, inspecting, re-assembling and bench testing PSV's installed on a high pressure ASME Section I power boiler?
  11. Sharik

    PSV Inlet Piping Size

    Thank you vladrath. But I'm confused on how the Sched 160 piping would meet the requirements of ASME Section VIII, Div. 1, Paragraph UG-135 (b)(1) where it is required the opening through the pipes must have at least the area of the safety valve inlet?
  12. Sharik

    PSV Inlet Piping Size

    A safety valve with a socket welded inlet connection, indicates an inlet size on the valve nameplate of 0.75". How does this work? If the inlet piping is 0.75" NPS, Sched 80, the pipe ID is 0.742". But if the inlet piping is 0.75", Sched 160, the pipe ID is only 0.619". Wouldn't the Sched 160...
  13. Sharik

    Safety Valve Size and Piping Connections

    Thank you Gerhardl. I understand calculating the actual flows capable in piping to the PSV. But what about ASME Section VIII, Div. 1, Paragraph UG-135 (b)(1) which requires the cross sectional area of the piping to be at least equal to the cross sectional area of the PSV inlet?
  14. Sharik

    Safety Valve Size and Piping Connections

    A safety valve with a socket welded inlet connection, indicates an inlet size on the valve nameplate of 0.75". How does this work? If the inlet piping is 0.75" NPS, Sched 80, the pipe ID is 0.742". But if the inlet piping is 0.75", Sched 160, the pipe ID is only 0.619". Wouldn't the Sched...
  15. Sharik

    CSA B51 Interpretation

    GenB Thank you for the reply. But if the equipment is exempt from the CSA B51 Standard, why would a CRN be required? I'm not getting good replies from the provincial AI.
  16. Sharik

    CSA B51 Interpretation

    I have a question regarding Hydropneumatic Expansion Tank vessels. Paragraph 7.4.3 states: "Hydropneumatic tanks shall have a minimum design pressure of 690 kpa and meet the requirements Section VIII, Division 1 of the ASME Code. A hydropneumatic tank with a maximum diameter of 610 mm, a...
  17. Sharik

    ASME B31.1 Non-Boiler External Piping

    I must be missing something then. When I look at the scope for ASME B31.1, Non-Boiler External piping, Fig. 100.1.2(B), for drum type boilers, it states "Nonboiler External Piping and Joint (NBEP) - The ASME Code Committee for Pressure Piping, B31, has total administrative jurisdiction and...
  18. Sharik

    ASME B31.1 Non-Boiler External Piping

    What are the NDE and pressure testing requirements for ASME B31.1 NonBoiler External Piping? I was always under the impression for NBE, everything basically went to the requirements of ASME B31.3, Process Piping.
  19. Sharik

    PWHT After a Repair to a Boiler Superheater Header

    Metengr, I'm not trying to be argumentative but trying to understand the requirements. This boiler was designed and is being fabricated to ASME Section I, 2010 Edition with the 2011 Addendum. In this Code, PW-40.3 only indicates P3, Group 1 and 2 materials. I do not see where there are any...
  20. Sharik

    PWHT After a Repair to a Boiler Superheater Header

    I know the requirements of PW-39 for a circumferential heating band, but how can this be done on a header where the bottom half of the header is all tube stubs? The way I read PW-39.3, the heating band would have to be width of the pad, including the fillet welds, plus 2" on either side (my...