Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: verdiblue
  • Content: Threads
  • Order by date
  1. verdiblue

    API 650 Reinforcement Plates

    Hi all - im having a bit of trouble determining whether a tank built to api 650 requires reinforcement plates to be magnetic particle tested. i note that pneumatic testing is required however apart from the distinction of the material, i can find no requirement for MT testing on the welds for re...
  2. verdiblue

    thickness range revisited

    thread725-238462 referring back to this thread in regard to thickness i have a welder qualified on a two process pqr and another who is not - gtaw for root/hot pass i was reffring to qw451 in my answer to the project manager with the proviso that furher info is req'd. question is, can i use the...
  3. verdiblue

    AWS D1.1 Table 4.5 # 34-Essential Variable Clarification

    hello people so referring back to this thread - http://www.eng-tips.com/viewthread.cfm?qid=315118 - if i have a pqr that qualifies a double sided cjp with backgouging and the wps refers to a single sided cjp with backing strip without backgouging is the wps applicable and does this comply under...

Part and Inventory Search