Hi, couldn't find any references to minimal distance between under ground propane tank to pillar of high voltage. The pillar is grounded in case of a bridge of cables, and this creates a risk to close UST. Please advice, or give reference relevant. Is the electric distribution company has some...
Hi, I would ask any help on interpretation of the right applicable standard for design demands. There are a group of spherical tanks each in the size of 1500 Ton LPG. This is a farm of containers that located inside the refinery premises, and used to store the final product before delivery to...
Hi, I would ask any help on interpretation of the right applicable standard for design demands. There are a group of spherical tanks each in the size of 1500 Ton LPG. This is a farm of containers that located inside the refinery and used to store the final product before delivery to road tracks...