i have a problem where i have had to cut out a square 750x750 from a 600mm suspended deck for piling purposes at a sea berth. i was wondering what was the best solution as i have just started working in this area and am a bit inexperienced. have a 100mm pre cast panel placed at the bottom of the...
i have a construction method problem in regards to a sea berth, the concrete deck has settled 50mm and our client wants to put in more piles(deeper than existing) and a steel beam underneath the deck to help stabilise the deck from fender forces and vertical loads from cranes,etc. we have cut...