Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: matt1829
  • Content: Threads
  • Order by date
  1. matt1829

    OPEN CUT SHORING DIAGRAM

    I got permission to Open cut the railroad and they said they wanted to see a shoring diagram due to liability purposes. Does anybody have any info on where I can take a look at any diagrams or what they might be looking for. Obviously, if we got permission to open cut, then why the hell would...
  2. matt1829

    E-80 Loading Determmination

    Does anybody have examples on Defelection Determination (Spangler Formula) I need to prove to the RR Company that a 36" Casing pipe (coated) is thick(.75") enough to support E-80 Loading. The casing pipe is going to be approx 3' below the RR Tracks. 2-A modified Stone will be used for...
  3. matt1829

    DIP Under Railroad

    Hey guys I need your help. I have an existing 2x6 culvert approx 1.8' under an railroad track. I was going to replace it with 42" Class 54 or 56 DIP(.017%) but I have no room for elevation change. The Prop DIP will be around 1.8' below the bottom of the track. Do you guys have any idea what...

Part and Inventory Search