  1. jrk7490

    Residential Gas pipe service size - New York City

    I have a client that wants to add an outdoor fireplace and BBQ Grill on a 4th floor balcony. There is an existing 1" gas riser with a 3/4" tee off for the condo. To add a fire place ad BBQ grill (plus the existing range) will require a 1" gas line. Is it allowed to install a 1" pipe...
  2. jrk7490

    Fire sprinkler system takeoffs

    I have been asked to perform take-offs for a proposed church in New Jersey as soon as the approved shop drawings are returned to the contractor for the engineer of record. I have produced shopdrawings several times but my main experienceis in the design engineering side however,I never...
  3. jrk7490

    shop drawings standard procedures

    Can anyone help me with a document listing the team player responsibilities of owner, architect, GC, Contractor and subcontractor? I am particularly interested on what is offered to produce shop drawings and who's responsibity it is to submit the required information.
  4. jrk7490

    Plumbing Shop Drawing procedures

    Can anyone help me with a document listing the team player responsibilities of owner, architect, GC, Contractor and subcontractor? I am particularly interested on what is offered to produce shop drawings and who's responsibity it is to submit the required information.
  5. jrk7490

    PE limits for sign/seal on projects out of their fields

    Is it me or is the PE designation heading for a catastroghy. I am asking for feedback on the issue when PE's sign/seal documents on systems in an industry they know nothing about. My latest encounter to this issue was where a PE and PMP whose main fortay was inspecting the stress in screws for...
  6. jrk7490

    water service next to elec panel issue

    I am designing rpz docs for a 3-story res bldg. 3rd flr converted to asst living space and fire spkrs were installed. It is now a dom water/fire splr loop system. The exist water is increasing from 3/4" to a 2" so a new service is needed w/an rpz. there is a plywood sheet on basement wall with...
  7. jrk7490

    Dry pipe sprinkler system design without flow test

    I have a new 12,106 sq.ft. building materials warehouse. Occupancy =S-1 - Commodity classification III (lumber) Building height is 27'. Racks include 4 high-2 deep pushback racks, bay racks, single sided and double sided pallet racks-all 18'h (top of storage is 22'), A-frame racks w/4 arm levels...
  8. jrk7490

    Fire Sprinkler System (Wet) and Rooftop Manifolds

    In a fully sprinklered medical office bldg. 2-stories with roof access via roof hatch in stairwell, is a roof manifold required? NFPA 14 states the requirement for fire standpipe and combined standpipes, but is a roof manifold ever installed on a wet auto. sprk. system? NY State jurisdiction...