We have a site where the existing material is organic, silty and which is replaced with compacted structural fill. There is an additional 10 ft of fill as well. Do we need to wait 2 months to build on it. Or can we monitor settlement daily and begin construction after 30 days.
We are proposing a soldier pile wall with drilled caisson for a slope repair project. The height of the wall is 13'. The pile embedment is 30.5' in soil. No ground water table encountered.
The soil parameters for the fill: phi- 30, unit weight - 120 pcf
The soil properties below subgrade: phi-...
Hello,
I am designing a temporary shoring for a retaining wall along the approaches of a bridge. Temporary sheeting with struts is provided out side the retaining wall.2 struts are provided at 1ft and 5ft below ground elevation. The contractor does not support sheeting on the embankment side...