I am putting this out for discussion:
Yesterday I visited a site. The fire sprinkler system was installed in 1970, 6" riser with a flanged check and OS&Y, all screwed sch 40 pipe. The system riser reduces to 4" after the FDC tee, and has a 4" flow switch.
The issue is that there are 3...