  1. sahelrahman

    disconnecting means

    Hi Can anyone pls tell me if a 45kVA 480v-208v remote transformer require a disconnecting means? Thanks
  2. sahelrahman

    Salary for an Electrical engineer

    I wonder what is the salary of an electrical engineer with three years of experience (in Dallas,TX) in lighting and power.
  3. sahelrahman

    single line to ground fault

    While doing the arc flash study, I wonder what effect does the single line to ground fault has on arc flash current and incident energy? When I performed the arc flash study, I did a mistake of low resistance grounding the transformer and generator instead of solidly grounding them. There was...
  4. sahelrahman

    inrush current of pdu transfomers and inst. setting of ups breaker

    Hi, I am currently doing a coordination study and I would like to know how to set the UPS instantaneous setting. I know I have to calculate and add the inrush current of all the pdu transformers and set the instantaneous setting of the static bypass switch circuit breaker to a level where it can...
  5. sahelrahman

    ZSI for cutler hammer MDS C-32 breaker

    Hi I am currently working on the coordination study using SKM power tool analysis. Questions regarding the ZSI settings. The SKM support told me that I have to input the Trip/Delay time(sec) for the breakers with ZSI module. The manufacturer said that the minimum trip time is 0.1. Please have...
  6. sahelrahman

    xfmr short circuit rating

    Is it true that the outdoor pad mounted transformer do not have a short circuit rating? Instead, manufacturers provide us with ansi damage curves..
  7. sahelrahman

    bracing rating

    What is bus bracing rating?
  8. sahelrahman

    Vacuum fault interrupter

    There are two vista switchgears, one fed from A-side and the other one fed from B-side. These switchgears serves transformers. Since the B vista switchgear is energized through the closed loop switch in each transformer a fault on a primary conductor will be fed direct from the utility and...
  9. sahelrahman

    fuse

    Hi, I am trying to select a S&C vista device. Downstream of this device is a fused transformer rated at 2500kVA, 34500kV/480V. The transformer fuse is rated at 8A. The current on the primary side of the transformer is only 5A. Can I select a vista fuse rated at 100A? Is it too high?
  10. sahelrahman

    Inverse definite time relay

    What is a inverse definite time relay? How does it work?
  11. sahelrahman

    protective devices

    I have a question regarding the protective device voltage. The utility is 34.5kV and the relay connected to the S&C vista SWGR is rated at 23000V. I always thought that the protective device voltage should always be higher than the bus voltage. Please advise... Thanks
  12. sahelrahman

    ZSI Trip units

    I am currently working on coordination study of a project. The curves of few breakers are overlapped. So it is tough to say which one will trip first. But what I understood is that, since the breaker trip units used has the characteristic of Zone selective Interlocking (ZSI) , the breakers...
  13. sahelrahman

    protective relay

    Hello everyone, can someone please let me know how to set the settings of a vista protective relay? On what basis is the pick-up, U2 inverse, Instantaneous and the definite time settings selected?