Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Inspectengr

    Weld repair of A216 WCB valve without PWHT (Cavity 75 x 38 mm)

    We have A216 WCB valve (Thickness of the part to be repaired is more than 100 mm) At current, due to cracks in bolt holes the excavated are is 75 x 38 mm with depth of 40 mm approximately As per A216 WCB Section 10 Repair by Welding 10.3 Castings containing any repair weld that exceeds 20 %...
  2. Inspectengr

    PWHT of attachment weld on on reinforcement paf

    Dear All Good day We have an Ammonia storage sphere. It was heat treated and carbon steel material. For supporting structure on top reinforcement pads are installed. On these reinforcement pads lugs are welded. Query is that we are going to replace the lugs due to external corrosion. There...
  3. Inspectengr

    Modfication in already FFS-III Assessed vessel

    Hello We have a vessel on ammonical water service as per ASME SECTION VIII DIV 1. It was imploded due to vacuum. And was restored due to mechanical jacks and pneumatic pressure. It was derated after FFS level 3 assessment.the study included details of all the welded patches in analysis. My...
  4. Inspectengr

    Modification on derated vessel. FFS Level 3.

    Hello We have a vessel on ammonical water service as per ASME SECTION VIII DIV 1. It was imploded due to vacuum. And was restored due to mechanical jacks and pneumatic pressure. It was derated after FFS level 3 assessment.the study included details of all the welded patches in analysis. My...

Part and Inventory Search