Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: icecool
  • Content: Threads
  • Order by date
  1. icecool

    Coal Fired Power plant Pulverizer CD is consuming more power

    Dear All, I am working in a 250MW Coal power plant. This power plant has 3 Tube mills. normally 2 are in service. These mills named as AB, CD, and EF. The problem is whenever I take Mill CD in service. It consumes more power than other mills (Mill rating is 2350 kw, Mill AB and EF takes around...
  2. icecool

    Steam Turbine performance with variation in inlet steam pressure

    Dear All, I am estimating a future problem while still in erection phase for 60 MW steam turbine. I may need your help to estimate a solution. Due to some reason my process heater is not able to generate steam at the desired pressure (other parameters are remain same). Therefore I want to...
  3. icecool

    VFD application on Pump

    Hello Everyone, Can anybody suggest me whether it is useful of adding VFD in Boiler feed pump in a power plant. I gone through the details. I understand the advantages of VFD but not sure about the overall burden of VFD on O&M cost. The overall cost of VFD is almost equal to the cost of Motor...
  4. icecool

    Whether A Pump with Gear Box (to increase pump speed) is Feasible?

    Dear Sir, I am trying to understand that whether a Pump who is flowing a High Temperature Fluid (Therminol) will be feasible with a Gear Box. The Gear Box will be used to increase the pump speed from 3000 rpm to 3600 rpm. The reason behind increasing the speed is high Pump TDH and as per...

Part and Inventory Search