Did anyone have experience with using Electrically operated Compressor especially in Tunelling works? The tunnel size is approximately 1.8m x 2 m of length approx 1 km.If so, please do provide me the Make and ratings of the machine. I need the rating to estimate construction power requirement.
Did anyone have experience with using Electrically operated Compressor especially in Tunelling works? The tunnel size is approximately 1.8m x 2 m of length approx 1 km.
If so, please do provide me the Make and ratings of the machine.
I need the rating to estimate construction power requirement.
We require three single phase transformer of 30 MVA forming one bank of GT connected to 82 MVA generator. We have three units in total.As per the grid availability, we are required to connect our plant to 400 kV line.
Isn't 400 kV on HV side of GT impractically high for 30 MVA GT? Please...
Hello all. Can you all recommend me good books and reference on "Protection system in hydropower plants"?? I would appreciate reference to good links also.
Thanks.
For instance if I have chosen 220 kV Gas Insulated Switchgear to be connected to 13.8 kV/ 220 kV Generator Transf. (3 nos. 1 phase forming one Transf. bank).
Do I provide one GIS unit each for incoming Transf. bank? And what will be the appropriate breaker scheme for 220 kV double bus bar...