Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. geotechguy1

    Horizontal displacement of earth dams during construction

    I'm trying to find a reference (preferably with case histories) for expected horizontal displacement ranges of an earth dam during construction as a percentage of height, eg. 0.5% to 1.0% of the height. I have that range (up to ~1.0%) in my head as a rule of thumb some grey haired guy in a...
  2. geotechguy1

    Online Geotech Masters

    Just curious if anyone has been through Colorado School of Mines Underground Construction and Tunnel Engineering program or the University of Illinois Urbana-Champaign online geotechnical programs
  3. geotechguy1

    Base shear depth of influence

    We're all familiar with the typical 'depth of influence' type calculations for vertical compression loads, eg. bousinesq stress distribution bulbs (take the depth of influence as the depth at 0.1 to 0.2Q), or the eurocode / british standard esque technique of setting the depth of influence as...
  4. geotechguy1

    Co-seismic fire ignition at WTP and WWTP

    Slightly esoteric question but does anyone know of any examples of co-seismic fire ignition at WTP / WWTP facilities during large earthquakes? Is this a credible hazard? FEMAS Hazus model addresses damage states for WWTP's but doesn't directly address fires at them, and the fire ignition...
  5. geotechguy1

    Newmark sliding block displacement

    For a seismic case on a circular slip surface using one of the simplified methods for Newmark sliding block (eg. Jibson) - what displacement are you actually calculating? For example, if you calculate a displacement of 200mm, does that mean you are calculating 200mm of displacement along the...
  6. geotechguy1

    Opinions on C25 / Rebuttals to C25

    Curious what people think about these documents on engineering geological modelling linked below. I increasingly struggle with engineering geologists who reference these documents essentially as a way to take almost the entire profession away from geotechnical engineers. The main concerns I have...
  7. geotechguy1

    Back analysis of stable un-failed slope

    I'm looking for a reference, the title of which eludes me on back-analysis of stable, un-failed slope. The reference presents a table of presumed factors of safety to use in the back analysis based on observed slope performance eg. 1.1 - if evidence of recurrent movement (i.e. there isn't a...
  8. geotechguy1

    Applying aging factors to clays

    Reaching a bit here, but does anyone know of any literature on applying aging factors to clays in cyclic softening assessments? I have sDMT and sCPT data. There's a whole body of literature on doing this for liquefaction assessment of sands (eg. Andrus / Hayati - Correcting Liquefaction...
  9. geotechguy1

    Newmark Sliding Block Dislpacement

    For a seismic case on a circular slip surface using one of the simplified methods for Newmark sliding block (eg. Jibson) - what displacement are you actually calculating? For example, if you calculate a displacement of 200mm, does that mean you are calculating 200mm of displacement along the...
  10. geotechguy1

    Estimating Displacements

    Suppose you have a tank where the base shear applied from fluid moving in the tank during an earthquake is greater than the available resistance from friction / passive resistance of the slab it's sitting on. Has anyone estimated displacements in such a situation, and if so how? I.e. assuming...
  11. geotechguy1

    Software for rigid inclusions / settlement reducing pile design

    Just curious if anyone know of any software packages specific for design of rigid inclusions or settlement reducing piles (i.e. piles not connected directly to the slab / foundation but sitting under a gravel load transfer platform). As opposed to doing it with a general-purpose FE program or...
  12. geotechguy1

    Japanese high-pressure gas pipeline seismic design guidelines

    Does anyone know if there is an English translation of this document and where I could find it. I'm trying to compare geotechnical aspects of various standards on the topic from the water, oil and gas, nuclear and other lifeline industry associations. I've found various references to the...
  13. geotechguy1

    Pile Springs / t-z / q-z curves for static analysis

    Does anyone know of guidance or research publications on deriving t-z / q-z curves for static analysis by hand. For example, API-RP-2GEO and API-RP-2A-WS present essentially bi-linear (or quadrilinear I guess if you count the strain-softening part of the curves) spring (t-z/Q-z) curve...
  14. geotechguy1

    Direct Labour Multipliers

    What Direct Labour Multipliers are your current employers running for their rates, and how does it line up with utilization? Every company I've worked at has ran between 2.25 - 3.3 DLMs (the lower DLMs for large government projects or small Geotech consulting firms that made most profit on...
  15. geotechguy1

    steep sand slopes

    Anyone know of any good references that focus specifically on stability of steep sand slopes. Think slopes of 45 degrees to vertical (or sometimes overhanging) made of sand or cemented sand. I have one good reference paper by Sitar and Collins (Geotechnical Properties of Cemented Sands in Steep...
  16. geotechguy1

    Landslides in New Zealand

    https://www.geplus.co.uk/news/deadly-landslides-in-new-zealand-follow-record-breaking-rainfall-03-02-2023/ Might be interesting - look up Cyclone Gabrielle. We had a cyclone at the tail end of one of the rainiest sequences of 12 months ever. The imagery really puts things into perspective...
  17. geotechguy1

    Changes to the iron ring ceremony

    https://engineerscanada.ca/news-and-events/news/engineers-canada-joins-others-in-calling-for-changes-to-iron-ring-ceremony For the Canadians out there who went through this. Good to see some changes being proposed. Personally, I went through this a decade ago now and I thought it was some...
  18. geotechguy1

    Geotextile wrap for drains

    Curious to hear anyones experience with geotextile wrap for subsoil drains, in particular any studies not funded by the geosynthetic industry on long term performance. I've seen a couple different combinations: Slotted pipe wrapped in a filter sock embedded in freedraining material. Slotted...
  19. geotechguy1

    Reference manuals for sewer rising main geotechnical investigations

    Does anyone know of any reference manuals or design guidance that cover geotechnical investigations for sewer rising mains (and also other types of linear civil infrastructure like water transmission / stormwater). I'm thinking along the lines of the EPRI guidance for geotech investigations for...
  20. geotechguy1

    How do people deal with meetings all day

    I've reached a career stage where it's not uncommon for me to have 4-6 meetings a day, at least for 2 or 3 days a week, often one hour each. How do people manage this? How do charge your time? It seems like people generally only budget for the meeting time (i.e. 1 hour meeting so they budgeted...

Part and Inventory Search