Does anyone have a good example of a Levee Interim Risk Reduction Measures (IRRM) Plan? I can't seem to find one. The USACE requires them on levee projects while long-term improvements are being made. I have the guidelines for preparing them, I am just looking for a good example. Thank you.
I am a PE in civil engineering but am looking for additional certifications to help advance my career. I work mostly in water resources and geotechnical engineering, but also do other types of work. I am thinking of the Certified Floodplain Manager certification. Any other suggestions?
I am having trouble modeling a culvert in HEC-HMS. I am using version 3.01. I tried version 3.4 but it had several bugs.
I have a watershed broken into two sections, seperated by a canal. There is a culvert under the canal. Basically, I want to model the contribution from the upper...