If you have earth dam composed of low permeability soils and this dam is exposed to flood , it should shear under undrained case. However, in most practice earth dams and levees are usually analyzed considering undrained shear only when they are under rapid drawdown case. Why the undrained...
If you have earth dam containing low permeability soil layer and this dam is exposed to flood , it should shear under undrained case. However, in most practice earth dams and levees are usually analyzed considering undrained shear only when they are under rapid drawdown case. Why the undrained...
- Is anyone aware of on-line spreadsheets doing the calssical geotechnical computations: bearing capacity, consolidation, earth pressure, mass-volume relationships, and other classical geotechnical formulas.
I am very clear with the underlying formulations and the philosphy on which these...
Retaining walls are guarded against overturnning by taking the ratio of the driving moments/resisting moments.
all around the toe.
But I noticed that driving moment of the force resultant of the effective vertical bearing pressure at the bottom of the wall (which is equal to the sum of the...
1-You get the undrained shear strength from the Vane shear test. Is this equivalent to the one we get from the undrained unconsolidated shear triaxial test.
If yes , which one does it represent.? the peak or the residual one.
2-By the way, can any one refeer me to a source where shear...
Hello my friends,
I am looking for a quick tool ,for example ,excel-sheet , for calculation of settlement of embankment on clayey soil just to have a quick felling on “what-if “ concerning the settlement of my embankment. Thanks a lot for support.
Does Triaxial Shear Extension test imply that the deviatoric stress q =(Simga Vertical-Sigma Horizontal) is negative or the change in deviatoric stress q is negative..?Or both.?
I know that when the change in q is negative (q decreases) while q still positive means unloading.
When would you...
Hello guys
A head person in my company has asked me to go and inspect a big tailings dam in remote site (interim preliminary inspection to ensure safety for a short run). "Direction by telephone could have been provided to me" the person said
I have never inspected such kind of huge structures...
Hello
They have a proposed location for a building (5 floors).
Not to far from the proposed site there are controlled explosion activities going on (Quarry source). I want to comment if siesmic activities impact the foundation location.
Plesae advise on some practical materials associated with...
Your geological map shows that you have a fault crossing your rock slope contour lines. If I want to consider a slope cross section for analysis for plane failure then what is the most dangerous cross section to consider as far as the fault is concerned. I believe that the section parallel to...
am conducting a rock stability analysis:
On the geological map I have only coulpe of lines each shows one fault. I projected these lines on the topographic map and I can see that one line is intersecting the slope contour and another is parrelle to the slope countors. My quesions are:
1-...
I have the topographic map showing the slope geometry and couple of intersecting faults existing in the slope region.
In order to perform failure potential for wedge and planner assessment. I only have topographic map showing the slope on which the faults are plotted and rock strength data...
I am a begginer performing a rock slope stability analysis
I have the topographic map showing the slope geometry and couple of intersecting faults existing in the slope region.
In order to perform failure potential for wedge and planner assessment. I only have topographic map showing the slope...
I am doing a water-pressure test on U pipe installed 200 m within the ground ( for heat source pump system).I applied a pressure of 700 KPa . However, the pressure after 9 hours drops to 650 Kpa. The temperature is not less than 1 degree. Does that indicate leakage? Is it acceptable