Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: murdock
  • Content: Threads
  • Order by date
  1. murdock

    Small/Mid-Size Water System Design - hydro tank vs. elevated storage?

    Hello all, I have been tasked with providing options for an expanding a small campus's water system. My previous experience with potable systems is for much larger operations, with 100k gal elevated reservoirs serving a population on the order of 6,000 people. This project is related to a...
  2. murdock

    Error 540 - when was this implemented?

    I have an older hydrocad model that was built in v10, build 1. Recently I updated to the latest build, and when I ran the model, received this error on a pond with an exfiltration and culvert outlet. I don't recall getting this error before, when was this error added to the list?
  3. murdock

    Recreating model of older version in 10.00

    Hello, I am attempting to re-create a hydrocad model based on output reports. This original model was created in version 8.5, and I am using version 10.00 to build it. I have success in getting similar outputs for the subcatchment and reach nodes, but the pond node is behaving oddly, my...
  4. murdock

    Groundwater drawdown in swale?

    Hello all, I have been asked to estimate the extent of groundwater level drawdown for a proposed swale (2' deep) that extends through a wetland (presumed groundwater elevation 6" below grade). The regulator is asking for an area around the swale that will have a lowered water table elevation...
  5. murdock

    Simple Method Model - Source?

    Hello, I have worked with the simple method model for determining annual pollutant load in the past. Now I'm tasked with doing it again, but I was given this source for the model formula: http://des.nh.gov/organization/divisions/water/stormwater/documents/wd-08-20a_ch8.pdf formula is on the...
  6. murdock

    determining detention time w/exfilter system

    Hello all, I am working on a storm facility located in sandy soils, so I plan to use infiltration practices. One of the design criteria is the detention of a 1-year storm event over a 12 hour period. When modeling my pond without infiltration, I can size a control orifice that provides the 12...
  7. murdock

    plug flow versus center of mass

    In my state, the regulators typically look at the COM detention time to determine if their criteria are being met. In the model I'm working on now, the plug flow time is nearly double the COM time. Reviewing HydroCAD's website entry on the difference between the two, I believe that using COM...
  8. murdock

    pollutant loading - annual vs. per rainfall event

    I am looking at the new feature that provides the pollutant loading for subcatchment areas. IN the reports, it appears that the results give a quantity of pollutant per storm event. Is there a way to get an annual pollutant loading number from this new feature? Thanks, - shane
  9. murdock

    gravel pit noise modeling

    Hello, I am re-permitting a gravel pit and working on a noise model. Unfortunately, the crusher is inoperative at the moment and I cannot directly measure noise levels. Does anyone have information on 'typical' crusher noise levels that I could use to plug into a noise attenuation model...
  10. murdock

    vibration testing - rental meters

    Our firm is looking into offering vibration testing for the commissioning of buildings. We have reviewed the materials at the NEBB website and have a decent handle on what goes into the testing procedure. Now we are looking to rent a meter to do some dry runs. Does anyone here have...
  11. murdock

    sand/gravel pit - safety regs

    Hello, I am starting the environmental/permitting work for a sand & gravel operation. I'm looking for safety regulations for pits (e.g. max cut slopes, design of benching, min tree clearing width at top of slope, etc.) on the MSHA website, but quickly got lost. Anyone have a link to this type...
  12. murdock

    small pond outlet culvert - anti seep collar?

    Hello, I am working on the design of a culvert that serves as the primary outlet of a stream-fed pond. I have sized the structure as an 83" x 57" pipe arch. 100-yr storm flow is 163 cfs, and the pond rises 3.25' during the storm. The embankment of the pond is about 10' tall at its highest...
  13. murdock

    modeling storm chambers and upstream diversion structure

    I am working on a model of some underground storage chambers with a catch basin upstream acting as a diversion structure. The catch basin has two outlets, one 2' higher than the other to bypass larger storm events. The chamber system is designed to infiltrate/detain the 1-year storm. This...
  14. murdock

    Pond bank stabilization

    (cross-posted to earthwork and storm forums) I have two ponds in the center of a residential neighborhood that have slumping banks. The soil has eroded in 12" x 12" chunks in the steeper sections, and a more uniform erosion in the shallower sections. The side slopes of the pond range from 3:1...
  15. murdock

    Modeling of larger (1700ac) watershed

    I have been tasked with creating a model of a 1700 acre watershed of a brook. This model will be used to find at what rain event a diversion structure (basically a long weir along a portion of the streambank) will start to come online. A previous consultant performed a model, but did not use...
  16. murdock

    hydraulic conductivity of crushed stone

    This question is kind of a mash-up of a this forum and the hydrocad/storm modeling forum. I have been asked to model storm flow down a swale that has check dams installed. I am planning to use hydrocad's pond node and use the exfiltration device for an outlet. I need to spec the hydraulic...
  17. murdock

    The PMP - Tips on Modeling?

    I have been working on a retrofit to an existing stormwater pond (increasing its detention time for a 1-year storm event). In the state review process, the project has been referred to the Dam Safety section, which is concerned with the pond's performance during the Probable Maximum...
  18. murdock

    check dams/rip rap channels

    I am evaluating the velocity of flow through a rip rap channel with stone check dams. Modeling just the reach with the rip rap (n=0.04) gave a velocity of about 3 ft/s. When I used two ponds (modeling the two check dams), the velocity was much higher (6.2 ft/s). I recognize this as the pond...
  19. murdock

    What is the rationale for the Channel Protection Volume?

    In Vermont, we are using the regulations developed with the help of the Center for Watershed Protection. One of the criteria, the channel protection volume (CPv), requires "12 or 24 hours of extended detention storage for the 1-year, 24-hour storm event." Most of the time I have used...
  20. murdock

    Estimated Soil Loss in a Swale

    first: sorry if this comes up twice, I think the post was eaten the first time around. I have been tasked with estimating the amount of yearly soil loss in a roadside swale. The swale is approximately 1,100 feet long, and drains about 12.5 acres in a low-density residential area. The...

Part and Inventory Search