Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: BGRIDDLE
  • Content: Threads
  • Order by date
  1. BGRIDDLE

    Determining length of weld needed and spacing

    Hello, I am an Estimator/ Pm in a civil sitework construction co. I bid a job doing destination signage on a local gov't Naval facility. Aside from calcs required to determine footing size required for the poles, I am interested in if someone can tell me a formula for determining weld length...
  2. BGRIDDLE

    coolant/ hydraulic oil waste containment/ storage unit

    I am looking for some advice on waste container storage unit design. I work for a earth/ sitework and utilities contractor and was contacted by a firm who wishes to have a storage shed for the above purpose. I was told they will be dealing with coolant and hydraulic oils, and possibly pressure...
  3. BGRIDDLE

    spotting, molting of 6000 psi conc slab

    A plant manager wanted 6000 psi concrete with #8 bars each way, #4 bars each way, and a layer of WWR in a 10" slab. I bid the job and was hired. The fact that the guy was changing things along the way (including the size of a machine pit for which I had already sent drawing to a steel fab.) He...
  4. BGRIDDLE

    formula for cylindrical foundation

    I have a background in architectural engineering technology and am currently doing estimating for a site contractor and working on a job for some signage for the naval wepaons station. It's been some time since I have done structural calcs but have a need to run some numbers to determine 2...

Part and Inventory Search