This is a question about which hose connections are required to flow on the most remote standpipe. One party is arguing that you calc the top two as defined by the top hose valve + the testing hose valve while the other party defines it as the top two excluding the testing valve (as in the top...
In the 2006 International Building Code Section 905.4 Location of Class I standpipe hose connections. Class I standpipe hose connections shall be provided in all of the following locations:
2. On each side of the wall adjacent to the exit opening of a horizontal exit.
Exception: Where floor...
I was wondering about Covered patios. I have been looking into the requirements about when they are required. I hear this both ways about when they are or are not required, and I can't find anything in NFPA 13. Am I just missing it?