  1. leont

    Hi Everyone, Can somebody from thi

    Hi Everyone, Can somebody from this forum provide me with some guidelines for preservation plan for a 2 stages liquid ring vacuum pump. I assume, it can be pretty much the same preservation plan for any type rotating equipment. My background is not precisely rotating equipment, and I need to...
  2. leont

    Underground Cased piping

    Hi everyone, A section underground piping will be replaced and there is a need to seal the annular space between the carbon steel casing and the pipe. Can you guys please, shed some light on regards the type of sealing material normally used for this purpose? What's your experience on similar...
  3. leont

    Protective Carbon Steel Sleeve on Underground Piping - Road Crossing Piping

    Hi everyone, Is there any opportunity in this forum I am provide with technical information about the trend nowadays in the use of corrosion protective wraps on underground piping instead of typical design of corrosion protective wrap on pipe and carbon steel casing. There are countless...
  4. leont

    Cathodic Protection - Underground Pipe

    Dear Folks , I have been dealing with some issues related to cased underground piping and I need some technical help. When a CP is implemented the main purpose is to protect the bare pipe. However, the first barrier for soil corrosion as a damage mechanism is the sleeve. Both, the sleeve and...
  5. leont

    Underground Anchors Inspection

    I am looking for some feedback concerning inspection of the underground rod anchors of Flare Stacks or towers of communications. Meaning by that, the portion of the anchor system (concrete block and section of the rod between the concrete block and the ground surface). Is there any experience...
  6. leont

    API 661 Acceptance Criteria for warped and twisted tubes

    Hi everyone, Visual inspection performed on Air Cooled Heat Exchanger revealed some tubes are warped, twisted and with sagging. Tubes are SA-179, OD 1", tube-tubesheet joint is fully expanded in two grooves instead of seal weld. Location of the damage is about 6' from the back side of header...
  7. leont

    Acceptance Criteria for warped and twisted tubes of Air Cooled Exchanger

    Hi Everyone, A visual inspection on tubes of an Air Cooled Heat exchanger revealed tubes were found warped, twisted and with sagging. The fluid is Reach Amine and tube-to-tubesheet joint is full expanded in double groove. Tube material is SA-170, OD 1" and BWG 14. What is the acceptance...
  8. leont

    Mechanical design for deflagration Conditions

    Hi everyone, I need to complete an integrity assessment in a furnace operating in a Sulfur Recovery Unit, assuming this furnace eventually goes through a deflagration conditions. Trying to get information on this regard,I have found out detonation is pretty much the same than deflagration...
  9. leont

    Differential Hydro test on Shell and Tube Heat Exchanger

    Hi Gents, I have a Shell & Tube Heat Exchanger running to the following design pressure conditions: at 2200 psig on tube side and 220 psig at shell side. Background history points out this exchanger have always been hydro tested thru differential hydro test. However, drawing does not call for...
  10. leont

    Design Temperaturevs Operating Temperature

    In order to complete some integrity assessments, I have been reviewing some information concerning operating temperature of the pressure vessel. I noted that some of them appear to be running close to the design temperature. Some engineering practices state and recommend the maximum operating...
  11. leont

    Seal weld and single or double groove on Type shell & tubes heat exchangers

    Can somebody is this group shed some lights concerning technical information through which, I can state that double groove, single groove and seal weld is mandatory for tube to tube-sheet joint for type shell & tubes heat exchangers. Probably fluid clasification, thermal cycles and tube-sheet...
  12. leont

    Torque to Heat Exchanger Flanged Joint

    A recurrent leakage issue needs to be solved for a shell & tube heat exchanger at shell to tube-sheet to channel flanged joint, and partially exposed to cycle service. One of the options to solve the problem could be bellville springs washer. This is type sandwich flanged joint...
  13. leont

    Failure on the bellows of PSV's

    THE POINT TO DISCUSS IS, FAILURE OF THE BELLOWS ON SAFETY RELIEVE VALVES I have not a huge experience with this kind of failures on safety valves. This has been a recurrent issue and never a failure analysis has been completed. In the past the fuequency of failure was between 4 and 6 months...
  14. leont

    Pressure Drop through plate screens

    I have been dealing with pressure drop calculations through screen on bottom of reactor. In some of these cases I have had to deal with plate screen, elephant tools made of plate bars and some cases show up like a combination of screen cloth and plate screen. The point is that some times we can...
  15. leont

    Modification on Level Indicator

    Guys, The situation is the following: A modification is going to be performed on piping that connect a level indicator (Level Bridle) to a Steam Drum. Modification consist on vent valve installation on top of the level indicator. I would like to know whether such modification needs to be...
  16. leont

    Failure on Frozen Piping

    I am not familiar with failures due frozen conditions. Currently I am performing an assessment for a piping failed due frozen condition, and I would like to know how I can get the maximum pressure developed during the frozen process until piping gets the burst pressure. Im was wondering if the...
  17. leont

    Frozen piping assessment

    Hi dear friends, I´ve got to work in assessing a piping that it is frozen a day ago and I need to know: what should be the procedure through which, I can make sure about its mechanical condition, before it gets back in service. I know generally we can expect some cracks once the piping is...
  18. leont

    Hydrostatic Test in Atmospheric Tanks

    Hi Folks, If I have to wave a Hydrostatic test in an Atmospheric Tank, 200 ft diameter and 60 ft height because of economical and time reasons: How can I compensate this test with NDE? Is Hydrostatic test defined as a leak test or for testing the mechanical integrity of the tank?. How is the...
  19. leont

    Pressure Test on Air Fan Coolers

    An Air Fan Cooler has a design pressure of 80 psig, however data issued by process engineering indicates its operating max pressure is 8 psig. The test pressure should be 1.5*(PD) and it seems to be very big as compared to operating pressure. What is the reason Air Fan Cooler are manufactured...
  20. leont

    New Inspection Techniques in Tanks Aboveground

    Hi All A tank of Height 60’ and Diameter 200’. It is insulated and it will be inspected for roundness and plumpness. A bulge is expected to be detected through internal inspection. Do you know about the latest inspection techniques to be used and those companies capable to carry out such...