Hi,
I was requested to calculate the UCC for our newly installed Cogen Plant (4 GTGs + 1 STG) and to compare with the charges by the utility power company. Below is the sample of calculation.
Post Cogen : RM 68.2/MW-hr or USD 20.1/MW-hr
Utility Company : RM 220.5/MW-hr or USD 64.9/MW-hr...
Hi,
I was requested to calculate the UCC for our newly installed Cogen Plant (4 GTGs + 1 STG) and to compare with the charges by the utility power company. Below is the sample of calculation.
Post Cogen : RM 68.2/MW-hr or USD 20.1/MW-hr
Utility Company : RM 220.5/MW-hr or USD 64.9/MW-hr...
Hi,
We are planning to construct a 250,000 BPSD refinery. For power/steam supply we are also planning to install IGCC as an integrated facilities with the refinery.
Anyone got previous experiences on IGCC within a refinery. We anticipate a 200MW IGCC.
Thanks
ppm
Hi,
The GTG is designed based on certain composition of gas. Currently we don't have monitoring device to check the gas composition entering GTG. What is the impact to GTG if there is significant changes on the gas composition?
ppm
Hi,
Currently our fuel gas skid got heater to ensure/control fuel gas temp entering GTG combustor at 42 C. If the heater fail/trip & let say the FG temp reduces below 30 C, what is the impact to GTG? Was told the GTG will trip? What the normal criteria of FG temp?
Thanks
ppm
Hi,
We are planning to engage OEM engr/specialist for the supervision for installation, commissioning and performance testing of our gas turbine package. The contract will be on reimbursable basis i.e. manhour rate.
Any advise on how to effectively manage this type of contract? Any lessons...
Hi,
Our company standard states the following requirements:
"Electric drives shall be provided with an RCU mounted local to the motor. By means of this RCU, motors can be started/stopped and, in the "O" (neutral) position, automatically control"
Is this common practice even for small LV motor...
Hi,
We are planning to do IPF review on our cogeneration project. But I'm just skeptical on the usefulness of the review? Anyone got something to share
ppm
Hi,
I'm doing a cogeneration expansion project. For the existing cogen project we use Honeywell Experion for the DCS/SGS to monitor and control 4 trains of GTG/HRSG and 1 train of STG.
For the cogen expansion project, we plan to install one additonal train of GTG/HRSG. Hence we need to...
Hi,
For our recent cogen project (now under commissioning phase), we have installed MMS System 1 Rev 5 for monitoring of the vibration for gas/steam turbine. It was supplied by BN. Also we have the intention to expand the cogen by installing one more gas turbine.
Was informed by the eqpt...
Hi,
Was informed by the vendor that there is a max of 300 m cable length requirement from transmitter sensor to terminal point at rack room.
Any similar experience?
Thanks
ppm