Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: JohnVAME
  • Content: Threads
  • Order by date
  1. JohnVAME

    Charging for Multiple Reviews of a Submittal

    Hello, We are a consulting design firm and we review construction documents from our contractors versus the bid documents. We estimate construction document reviews by calculating the time it takes to review the submittal and then tacking on some factor (usually 1.5) with the assumption that...
  2. JohnVAME

    What Program do you use to Track Submittals?

    We receive tons of Shop drawings and Contractor Submittals. We currently use an Excel Spreadsheet to log and track it all. I was wondering is there a better way?!
  3. JohnVAME

    What program are you using to write specs?

    We are currently using Word - but I don't think this is the way to go anymore. If you do use Word do do you make your core spec? One large one fle per section?
  4. JohnVAME

    Interpertation/History of 'Grade 5 or Better'

    Hello Structural Engineers - I'm an ME in need of guidance. I am curious as to your interpertation of a Drawing that reads 'Grade 5 or Better' (in particular the Grade 5 ref. in a structural steel connection) for structural bolts. Without any other information, would you assume that means...

Part and Inventory Search