At the end of an acid job, I might end up with about 200m of fluid column in tubing.
The well is 2900m TVD, there is a tubing extension joint on the way and tubing cannot be swabbed passed this point.
I have only some approximate reservoir pressure data and I am afraid that at the end of the...
I have been asked to calculate maximum H2S release rate from an acid gas injection well.
Proposed stream has +/- 40% H2S; 50%CO2 and the rest are HC's. Everything is on paper - no lab data.
This work will also include well modeling to predict friction losses under different wellhead injection...
I am building an spreadsheet which would calculate the time needed to depressure a gas pipeline. The spreadsheet will calculate the depressurizing time for two scenarios.
Scenario 1 - the ppl is depressurized using a pipe with high opening valve. (flow calculations are done using Fisher...
The code below calculates the minimal distance in space of between two lines.
Points of line 1 have their coordinates x,y,z in columns c,d,b and those of line 2 in columns r,s,q. The minimal value is displayed in a message.
I want to change the macro so that each minimal distance for each...
We completed and frac stimulated last month a tight gas well (vertical, ~2200m). The frac sanded off, after ~80t of sand were gone into formation. Initial production 0.6mmscf/d. Well test analysis shows k ~ 0.1mD, S ~ -3.6, reservoir boundaries were not “felt” during the test.
Now, management...