I am checking a 42" steam turbine LP extraction piping for operation at the vacuum condition , i.e. subject to external pressure. Clause 104.1.3 of B31.1 refers to the procedure in UG-28, UG-29 and UG-30 of Section VIII, Div 1 for this purpose. Section-VIII, Div-1, UG-28 provides a methodology...
I am designing the HP Steam Pipe from the Superheater outlet to the steam turbine of a Supercritical Power Plant. Typically this pipe is designed for the Master Stamping pressure of the Super Critical boiler (ref PG-106.3 and Fig PG-67.4 of ASME BPVC Section-1) . The Boiler supplier of the Power...
There are many articles on Boiler Feed Pump transient NPSH analysis during load throw-off. Can anyone inform me about similar study for Hot Start situation ?
I am involved with the design of a Combined Cycle Plant.
The Steam Turbine exhaust is condensed in an air cooled condenser (ACC). The fan control of the ACC is done by measuring the turbine backpressure and comparing that with the turbine backpressure set point . The pressure controller adjust...
I am now working for a project where a GE steam turbine (250 MW, 60 Hz) , originally designed for watercooled condenser application, will now be used with air cooled condenser. So the backpressure will now increase from 2" Hg to about 4.5 - 5.0" Hg. The turbine has 40 " last stage blade (LSB)...
I am now working for a project where a GE steam turbine (250 MW, 60 Hz) , originally designed for exhausting into water cooled condenser, will now be exhausting to air cooled condenser. So the backpressure will now increase from 2" Hg to about 4.5 - 5.0" Hg. The turbine has 40 " last stage blade...