Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: deckie1026
  • Content: Threads
  • Order by date
  1. deckie1026

    Pressure relief device requiements for two pressure vessel in the same

    Section VIII Div 1 question: Is it permissable to have a single pressure relief device for two pressure vessels in the same system ? Pressure relief device and piping are sized with the corect capacity to provide required over pressure protection.
  2. deckie1026

    air receiver corrosion allowance ASME VIII Div 1

    Is there a minimum corrosion allownce for air receivers in ASME Section VIII Div 1 ? I can not locate this requirement.
  3. deckie1026

    ASME Section VIII Div 2, 2007 Edition

    Will the 2007 Edition still require an RPE for the MDR ? I have heard rumors to the contrary.
  4. deckie1026

    API 4F auditor

    Where can I find a competent API 4F auditor for an offshore/marine application ?
  5. deckie1026

    ASME VIII Div 2 question re AF 402

    AF-402 3rd sentence states"The exemptions for post weld heat treatment in Tables AF-402.1 and 402.2 are not permitted when the vessel is designed for lethal service. (AG-01.1(c)...." However, the Notes of Table AF-402.1 for P1 material (2)(b)1,2,3,4, list conditions where heat treatment is NOT...
  6. deckie1026

    hydrogen disbonding

    We have a vessel with shell material SA 765 Gr II clad with inconel alloy 625. Design temperature is 104 C. We will fit a non load bearing internal( alloy 825 ) to the shell. We plan to fillet weld (ESW process) the internal directly to the cladding. Vessel is in sour gas service. Is hydrogen...

Part and Inventory Search