Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: richthorpe
  • Content: Threads
  • Order by date
  1. richthorpe

    Temporary slope stability - Excavation

    I've been set the task of designing a temporary batter behind a subway wall. It's got to withstand the standard highway loads. there is limited working space due to where the carriageway is and so I've suggested a 2:1 slope for about 2m from the subway wall then tappering down to 1:1. The soil...

Part and Inventory Search