  1. thalathb

    closed condensate drain drum

    Hi, There is a closed drain drum for condensate system which is an underground vessel and covered by concrete. This vessel is buried with sand and under cathodic protection (CP). Question: What do we need the sand for? Can I remove the sand? Thanks in Advance for all of you.
  2. thalathb

    Crygonic Draining

    Hi every body, Does any one have any experience of "Crygonic Draining system" and how it works. I have a Crygonic system and I must to design a draining system for it!!!?
  3. thalathb

    Technical Evaluation

    Dear All, I'm reviewing two technical proposals from 2 bidders, and I'm suppose to do final techincal evaluation in order to help my boss to take his decision easly, what am i suppose to show in this, is there any typical format? Thanks
  4. thalathb

    Columns with two diameters

    Hi every body, Regarding the distilation cloumns, Why most of the demethanser and Deethanizer has two diameters, for exampel the de-ethanizer has bigger diameter at the bottom and smaller one at the top, vise versa for De-c1. Thanks and regards
  5. thalathb

    Operating & Control

    Hi all, Whats “operating and Control philosophy” documents on sales gas project or in general must describe? I appreciate your thoughts. Regards
  6. thalathb

    Sour water material selection

    Dear all, What is the proper material to be used for sour water vessels? currently our contractor is suggesting KCS+3mm 316L ss clad, or should we use SS? Thanks in Advance.
  7. thalathb

    Auto start Pumps

    Hi All, Could any one provide help for this matter please, What are the main systems I could not use Auto start pumps or not recomended. Thanks and Regards TH
  8. thalathb

    Bypass or Hand jack

    Gents, I know the system criticality plays a big roll here to design the valve with Bypass or Hand jack. But, does any one have tips or criteria to help for designing the Valves with bypass or Hand jack? Thanks and Regards TH
  9. thalathb

    Molecular sieves beds insulation

    We have two different plants one to produce sales gas and the other for LNG, Any how both of the two plant have the dehydration unit by molecular sieves. For the LNG plant molecular beds have an internal insulation and for the sales gas plant is an external insulation. Of course the inside area...
  10. thalathb

    Usefull training courses for process engineer

    All, I need your help to guide me to the right direction by listing down the vendors names of the usefull courses for me as a process engineer... Regards thalathb