Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: BobCully
  • Content: Threads
  • Order by date
  1. BobCully

    Programming Mitsubishi A Series

    On a standard(ish) processing machine that we produce, I have several (maybe 20) sequence programs running simultaneously. To step through each sequence I arrange a group of flags into a shift register- 8,12 or 16 bits long. The first flag in the group (the lowest) is forced on when the...
  2. BobCully

    Cutting Speed for PolyProp

    Can anybody tell me the optimum cutting speed for PP please? I have some large dia. parts (600 and 900 mm, that look like dustbin lids) that I need to trim and I am thinking of building a dedicated tool/machine. Thanks in advance.
  3. BobCully

    Timeway Diagrams, How to draw?

    Our small engineering company (in the UK) was recently taken over by a larger group. I have been writing the software for our own `standard' machine (although every one has been slightly different) for the last 20 years. Its a wet chemical processing machine, so in general I have some...
  4. BobCully

    Mitsubishi, CC Link System, Opinions Please

    We have been making a machine for several years that is crying out for distributed I/O, and we expect a new order in the next few months. I want to try the new I/O layout, instead of the multicore cables running out to the various parts of the machine. Our standard PLC is Mitsi A2SH series, and...

Part and Inventory Search