Hey everyone, I'm new to this forum and fairly new to hydraulic engineering. I'm educated in fluid power mechanics from my engineering technology degree, but far from an expert. Our company has decided to switch to totally ISO symbols on all schematics and I wanted to get some advice and...
Here's the question, if I delete an item in a BOM that is no longer needed, can I re-use this number for a different part even if this new part is not a replacement for the deleted part? I think this creates confusion but a coleague disagrees. I have always heard that this is poor practice, but...
Our company is making a change and I was wondering what other companies have done and some pros and cons to each way of doing this. Currently we quantify parts on the schematic BOM and also call them out on the installation or sub assembly BOM but give them a quantity of "0". For example a pump...
My question is similar to an earlier post - thread1103-185128. My situation is this, I am redesigning a part that is a welded assembly. It's form is changing slightly, but it's fit and function are not, therefore, I want to keep the same part number. However, several pieces are being added, and...
I use a spread sheet to track projects and invoices, I will have several projects in one spread sheet with several worksheets so that I can share similar values from a master worksheet "BUDGET REPORT" into the appropriate places in each project's worksheet. Currently I do this by using the...