Dear All,
I have always understood and Considered
a minimum of 15 Meter or 50 Ft distance as mandatory 'Keep away" for
safe operation and accessibility for Fire fighting in Oil refineries, Petrochemical Plants.
Please guide if this is OK, or Incorrect with kind reference please!
Thanks in...
Can any Forum Colleague may share
"ARAMCO Recommended Refinery Engineering Design Practice for Fire Fighting water reservoir Estimate"
i.e 12 hours at full rate fire fighting demands and 24 hours half rate fire fighting demands; or anything similar etc.
I'll feel obliged. This is needed for...
Dear Colleagues,
Posting in this forum as No attention in QC.... Forum
Can somone help with reliable/trustworthy Inspection Technique
In order to ensure Mechanical Intergrity of Convective Zone Finned Tubes of Fired Heaters especially the Plateforming furnaces.
For obtaining fairly good...
Dear Colleagues,
Can somone help with reliable/trustworthy Inspection Technique
In order to ensure Mechanical Intergrity of Convective Zone Finned Tubes of Fired Heaters especially the Plateforming furnaces.
For obtaining fairly good health estimate.
Best Regards
Qalander(Chem)
Dear all Hello/Good Afternoon
Kindly if somebody may provide the guidance sought by a colleague.
Urgent help/support will be highly appreciated.
Best Regards
Qalander(Chem)
Since no response from other Forum, May be this is more appropriate place!
Dear All Hello/Good Evening,
Kindly oblige through guidance on the %age sampling for Inspection/Testing for captioned subject Pipeline of Chinese or Korean Origin
Also guide with preferable technique to be employed...
Dear All Hello/Good Afternoon,
Kindly guide the %age sampling for Inspection/Testing for captioned subject Pipeline of Chinese or Korean Origin
Also guide with preferable technique to be employed i.e.
1)Ultrasonic
2)Radiography
3)Electromagnetic(Eddy Current)
Pipeline involved is around 6100...
Dear Forum Colleagues,
At one of the upcoming Refinery Installation,apology if inappropriate forum.
An (External) floating roof membrane recently fabricated has extra ordinary unevenness.
Expert comments/suggestions for removing the fault at the earliest with minimum extra work are...
Dear all,
We are in a process of reviewing/rechecking the safe temperature limits about our 'Revamped Crude oil furnace' transfer line temperature(safe)limit.
Any guidance/thoughts?
Material is A106 grade"B"
N.B:Posted also in heat transfer forum for an early response by either forum...
Dear all,
We are in a process of reviewing/rechecking the safe temperature limits about our 'Revamped Crude oil furnace' transfer line temperature(safe)limit.
Any guidance/thoughts?
Material is A106 grade"B"
Best Regards
Qalander(Chem)