I'm working on a project in SW Washington state. We just finished a new bridge and will be switching traffic onto it this summer. The problem I have is that the traffic switch puts both directions of I-5 on the bridge for this next stage of construction. This is only temporary and is not the...
I am looking for ideas on how to tie-back a temporary shoring wall. Our current plan is to cast some rather large deadmen and use coilrod to tie back the pile. The problem with this approach is that the deadmen would be located within a embankment area and will interfere with the placement of...