I used a Megger CTER-91, followed procedure and produced a nice saturation curve of 1200:5 CT's. With known sceondary voltage injected and known primary amps measured, how do I proceed to interpret the results? What computations do I do and what nameplate values from tested CT's are pertinent? I...
Would like a down and dirty explanation or references to basic explanation of modes
of generator operation. Particularly "blackstart" of gas turbine power plant in a
municipal power setting, the operation of 3 generators 20MW+20MW+40MW.
What do I expect to happen with no existing grid...