Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. milwaukeebob

    120/240V 1P-3W, 100A Service to Very Remote Building

    Greetings everyone, I have a question regarding a fairly straightforward but odd situation/request that I've not seen in my plant days. The majority of my experience is in plant generation with fairly limited cable lengths and standard configurations. In short, I have a customer who needs...
  2. milwaukeebob

    Equipment BIL Rating Concerns

    Hello, I was recently brought into a project that involves installing a new piece of electrical equipment into an existing substation. The new equipment (a harmonic filter bank) is being installed on the 24.9kV of the substation. The substation is located at ~7150 feet above sea-level and...
  3. milwaukeebob

    NEC 110.26(C)(2) ...Egress from Working Space for Large Equipment "Rated" 1200 Amperes or

    I have a question related to NEC 110.26(C)(2) and an existing electrical MCC room installation. The installation has an MCC with a 1200AF main incoming circuit breaker (CB) that is set at 800AT. The MCC is labeled and rated 1200A but set to trip at 800A. The upstream CB feeding this MCC main...
  4. milwaukeebob

    Fire Pump Controller/ATS Normal versus Alternate Source Requirements

    I have a question regarding a fire pump/motor and associated fire pump controller/auto-transfer switch (ATS) installation at small power generation plant (<40MW). The plant is in the final stages of installation and commissioning has already begun. Note the owner of the plant is not a utility...
  5. milwaukeebob

    MV Switchgear Ground Bus Connections to Ground Grid

    Hello, Have a question about a line-up of medium voltage (MV) switchgear. This is one of longer line-up's of gear I've encountered in my career measuring almost 40' in length. The main bus is rated 15kV, 2000A, 25kA, 3PH-3W and consists of seven (7) feeder breakers from very small generators and...
  6. milwaukeebob

    NFPA Definition of &quot;Structure&quot; and Ruling

    Hello, I have a question regarding the NFPA definition of a structure. I know in the 2017 Code the definition of a "Structure" was changed. The definition now states "That which is built or constructed, other than equipment. (CMP-1)". They added the reference to equipment for clarity. I am...
  7. milwaukeebob

    Small Concrete Pads and Acceptable Levelness Tolerances

    Hello folks, I'm an power systems electrical engineer and have a concrete related question. Not sure if this is best posted here in the Civil or in the Structural forum. I'm working on a new project that involves the installation of two (2) small dry-type transformers rated 1500kVA. Each one...
  8. milwaukeebob

    NEC Figure 310.60(C)(3) - Cable Installation Dimensions for Use with Table 310.60(C)(77) Thru (86)

    This is a continuation of a recent thread I started but I decided to post this question separately because I felt like it stood on its own I am either missing something obvious or misinterrupting the Code in this regard. NEC Figure 310.60(C)(3) for detail 2 (3 electrical ducts) and detail 3 (6...
  9. milwaukeebob

    Ground Riser Termination to I-beam

    Hello forum members, please find the attached pic showing a ground riser termination a contractor made to an I-beam. It's understood this ideally would be a cadwelded connection but my question is related to them utilizing the same hole for the conduit strap as they did for the ground cable lug...
  10. milwaukeebob

    NEC Table 310.60(C)(77) and related Figure 310.60(C)(3)

    Hello, I have a question related to NEC Table 310.60(C)(77) “Ampacities of Three Single-Insulated Copper Conductors in Underground Electrical Ducts (Three Conductors per Electrical Duct) Based on Ambient Earth Temperature of 20°C (68°F), Electrical Duct Arrangement in Accordance with Figure...
  11. milwaukeebob

    Open Delta-Open Delta Xfmr with GFCI on Secondary Side

    Hello forum members, It's been a long time since I posted. Took some time away from the industry but I'm back and looking for some guidance. I just ran into something I've never seen before. Project I'm on has a small 3kVA xfmr 3-phase, open-delta, open-delta winding configuration, 240V...
  12. milwaukeebob

    Cable Ampacity Question &amp; Number of Cables/Phase (NEC 310)

    Hello, I have a follow-up question to a thread I started last week titled "Dry-Type Transformer Secondary Cable Sizing". A colleague and I have engaged in another small debate regarding the actual number of cables per phase that need to be installed on the secondary of the transformer. In...
  13. milwaukeebob

    Dry-Type Transformer Secondary Cable Sizing

    Hello, I’m currently supporting a project involving the replacement of an existing generator excitation system. The upgrade involves the installation of a new excitation xfmr, static excitation equipment (controls and power section), associated power and control cabling, etc. The specific...
  14. milwaukeebob

    Aluminum Pads, Connecting Hardware Choice

    I have an electrical application requiring the connection of two flat aluminum surfaces. The connection requires bolting hardware. Ideally the hardware would be aluminum. Unfortunately due to project schedule and availability, aluminum hardware is not available. My choice is to use stainless...
  15. milwaukeebob

    OSHA Rules on Personnel Protection for Surfaces Greater then 140 deg

    Hello: I'm not sure if this is the correct forum for this question but I'm assuming those most familiar with ASME codes may be able to provide some guidance. I'm actually an electrical engineer at a combustion turbine (CT) power plant in the southwest part of the country. Recently, some...
  16. milwaukeebob

    Cooling Tower Plume Constituents

    I realize this may not be the proper forum to ask these questions but I’m unsure where to turn for help. Although I'm requesting non-technical feedback, I decided to post this on the Corrosion Engineering Forum due to the root cause of the issue. I’m an employee of a power plant in the desert...
  17. milwaukeebob

    MCC Bucket Failure - Electrical Fault

    Hello, first time user looking for some guidance. I am stationed at a combined-cycle power plant. An MCC which services our cooling tower experienced a major electrical fault during the start of one of the fan starters. The MCC bucket is no longer usable and needs to be replaced. The following...

Part and Inventory Search