I'm trying to reporduce Table 11L from the 2001 NDS For Wood Construction. I'm using the Yield Limit Eqations found in Table 11.3.1A but can't come up with the same values listed in Table 11L. If I understand the code correctly, the minimum value obtained using the 6 formulas should be what is...