Can anybody recommend a method to track First Articles through 10 different departments? My company is an electronics manufacturer. We evaluate components, PCBs, PCBAs and metal enclosures from various manufacturers and suppliers. I have recently been challenged to create and manage a system for...
I am in the process of performing destructive pull tests on BNC connectors crimped on 18, 20, 24 & 26 gauge cables to determine the quality/strength of the crimp. What is the standard for determining the minimum acceptable pull strengths for each of the gauges? I have found minimum standards...