Our Contractor on this FEED stage of project has taken this approach to configuration of PSV discharge piping going to closed system in this case to flare with the purpose being to save money on isolation valve side. (see attachment)
I have not seen this approach before and we have concerns...
Hi,
In a developing project our senior management have taken decision not stipulate interconnecting pipelines between process units to be piggable and as a result of this we are considering no code break between ISBL and OSBL and all will be to ASME B31.3. We will be considering temporary...
Hi,
On a recent site visit in (Middle East)for future project I noticed that the interconnecting pipelines between various plants and/or loading terminals are run on as expected pipe tracks/sleepers but the expansion loops are in a vertical plane with vents rather than the traditional...
We have an upcoming shutdown in Offshore Platform in Arabian Gulf and have open to atmosphere systems such as drains and vents.
I have experience of Operating Companies stating waiver to pressure testing within their own standards but cannot find any hard justification in any code except for...