We are a small Consulting Engineering Firm. A City we were doing a lot of work for has hired another "extremely" large firm to do their work. We were asked to design approximately 4 projects prior to the change of consulting firms. We have now been asked to stop design and turn over our work...
I'm doing a LOMR for the City here in Oklahoma. I have duplicated effective study running through HEC-RAS. I cannot get the BFE's to the .5' acceptable range. The E431 is hard to read. Do I have to make the duplicate effective model work or can I document why it doesn't .
Thanks,
OUGOOCH